Press-Republican

Local News

October 9, 2012

Road Construction Roundup: Oct. 9, 2012

(Continued)

Route 9, Chesterfield: Traffic will be reduced to a single lane moving in alternating directions at Trout Pond Road. Work is expected to be completed in late October.

Route 22, Willsboro: Traffic will flow in a single lane in alternating directions from the Willsboro/Essex line to the Chesterfield/Willsboro line due to road construction that will occur until further notice.

Route 86, Wilmington: Traffic will flow in a single lane in alternating directions at the Wilmington/North Elba line. Crews are performing bridge work over the West Branch of the Ausable River. Construction is expected to be completed this month.

Interstate 87, Exit 32: Crews are performing road construction in both directions from Exit 32 to the AuSable/Chesterfield line. Traffic will be reduced to one lane in both directions.

Route 9N, Keene: Traffic will be reduced to a single lane in alternating directions at the intersection with Route 73, due to bridge construction. Traffic will be controlled by a temporary traffic signal.

Route 9N, Port Henry: Traffic will be reduced to a single lane in alternating directions from Bridge Road to County Route 2 due to road construction over Grove Brook at Island Way.

FRANKLIN COUNTY

Poplar Street, Constable: Crews are repairing a bridge. The road will be closed for two to three weeks. Motorists should follow the detour, which follows Davenport Drive to Route 30 to Stebbins Road to Poplar Street.

— Compiled by Contributing Writer Matthew Hamilton

Text Only | Photo Reprints
Local News

North Country Scenes


Click on photo to view gallery with latest photos

FYI...